I got to the Pillbox Studio after midday and had lunch before I got stuck into it. The band who were in the studio previously weren’t courteous enough to tidy up after themselves, so I spent a lot of my time tidying up cables and such. Eventually I got everything where it needed to go.
I arranged all of my own gear and cables before placing microphones.
Then I was finally ready to go into the control room and check the signals.
The patch leads are very colourful.
Happy with day one.
Days two and three will be recording tracks and starting the mixdown.
– Rhys